Fasten the shutoff valve to the cold water pipe with the pipe clamp.
Install the shutoff valve on the nearest frequently used drinking water line.

Shut Off the Main Water Supply

Turn on the nearest faucet long enough to clear the line of water.

Install the Shutoff Valve

1

2 Choose a location for the valve that is easily accessible. It is best to connect into the side of a vertical water pipe. When it is necessary to connect into a horizontal water pipe, make the connection to the top or side, rather than at the bottom, to avoid drawing off any sediment from the water pipe.

3 Drill a 1/4″ hole in the water pipe, using a sharp bit. Remove any burrs resulting from drilling the hole in the pipe.

4

5 Tighten the clamp screws until the sealing washer begins to swell.

Do not overtighten or you may crush the copper tubing.

Pipe Clamp

Washer

 

Inlet End

 

 

 

Vertical Cold Water Pipe

Saddle-Type Shutoff Valve

Safety Information Operating Instructions Installation Instructions Troubleshooting Tips Customer Service

27

Page 27
Image 27
GE 1825 owner manual Shut Off the Main Water Supply, Install the Shutoff Valve

1825 specifications

The GE 1825 is a remarkable evolution in the world of gas turbine technology, produced by General Electric, a company renowned for its innovative engineering and commitment to power generation solutions. Launched as part of GE's 7FA series, the 1825 model has established itself as a pivotal asset for both industrial and utility applications.

One of the standout features of the GE 1825 is its design efficiency. Engineered to deliver a high output while ensuring low emissions, this gas turbine operates effectively in combined cycle settings, making it an ideal choice for power plants aiming to optimize their production capabilities. With a robust output capability of around 1825 megawatts, the turbine is well-suited for large-scale operations requiring reliable energy generation.

The GE 1825 employs advanced technologies to enhance its performance. The turbine incorporates sophisticated air-cooled components, which help maintain operational integrity at elevated temperatures. This design focuses on durability and longevity, minimizing the need for frequent maintenance. Moreover, the GE 1825 turbine utilizes a state-of-the-art combustion system that not only boosts its thermal efficiency but also reduces nitrogen oxide emissions, aligning with global environmental standards.

Another notable characteristic of the GE 1825 is its operational flexibility. This turbine can seamlessly adapt to various fuel sources, including natural gas, distillate oil, and other alternative fuels. Such versatility enables power plants to optimize their fuel consumption based on market conditions and availability, thus achieving better economic performance.

In terms of control technologies, the GE 1825 is equipped with advanced digital systems that facilitate real-time performance monitoring and predictive maintenance. This capability allows operators to maintain optimal performance levels while ensuring that potential issues are identified and addressed before they escalate into critical problems.

Ultimately, the GE 1825 gas turbine stands as a testament to General Electric's commitment to energy innovation, providing cutting-edge technologies, exceptional efficiency, and operational flexibility. With its high power output, reduced emissions, and advanced control systems, it plays a crucial role in the evolving landscape of power generation, meeting both economic and environmental challenges in today’s energy market.