Installation Preparation
PARTS SUPPLIED
IN INSTALLATION PACKAGE:
■Two
■2
|
|
| Side and Top Trim Pieces on some models | |||
Drain Hose | Hose Clamp |
|
| |||
|
|
|
| |||
Screw Kit |
| Side Mount Kit | Zip Ties | |||
|
|
| (some models) |
| ||
#8 Phillips | #10 |
| #8 Phillips |
|
| |
Special | Side- |
| ||||
Head Screws |
| |||||
3/8" long for | Mounting |
| ||||
5/8" long | 1/2" long |
| ||||
Brackets | Junction Box Cover | |||||
|
|
| ||||
|
|
|
|
|
MATERIALS YOU WILL NEED:
■Ferrule, compression nut and 90° elbow (3/8"NPT external thread on one end, opposite end sized to fit water supply)
■Thread seal tape■90° Elbow, | Hand | Wire Nuts (3) |
| ||
Ferrule and | Thread | |
Compression Nut | Valve | Seal Tape |
Materials Needed for
New Installations:
■Air gap for drain hose, if required■Waste tee for house plumbing, if applicable■Electrical cable or power cord■Waste Tee | Electrical Cable | Hot Water Line |
| (or Power Cord, if applicable) |
|
| GPF65 | Hose Clamps | Strain Relief |
|
| Optional | |
Air Gap |
| 10' Drain Hose | |
Bracket Kit |
| ||
|
|
| GPF10L |
TOOLS YOU WILL NEED: |
| |
■ |
| |
■ 1/4" and 5/16" nutdriver | ||
■ 6" Adjustable wrench | ||
Screwdriver | ||
■ Level | ||
| ||
■ Carpenter's square |
| |
■ Measuring tape |
| |
■ Safety glasses |
| |
■ Flashlight | 15/16" Socket | |
| ||
■ Bucket to catch water when flushing the line |
For New Installations Only: | Flashlight | |
■ Tubing cutter | ||
| ||
■ Drill and appropriate bits |
| |
■ Hole saw set |
| |
| Gloves |
| Level |
1/4" and 5/16" |
|
Nutdriver | Carpenter's |
| Square |
6" Adjustable Wrench
| Tubing Cutter |
| Measuring Tape |
| Safety Glasses |
Bucket | Drill and Bits |
Hole Saw Set |
2