GE 2900 Before You Begin, Tools You Will Need, Zoneline Components, Installation Instructions

Models: 2900 3900

1 24
Download 24 pages 32.34 Kb
Page 11
Image 11
Installation Instructions

Installation Instructions

Zoneline Air Conditioners

Questions? Call 800.GE.CARES (800.432.2737) or Visit our Website at: ge.com

BEFORE YOU BEGIN

Read these instructions completely and carefully.

IMPORTANT – Save these

instructions for local inspector’s use.

IMPORTANT – Observe all

governing codes and ordinances.

Note to Installer – Be sure to leave these instructions with the owner.

Note to Owner – Keep these instructions for future reference.

Proper installation is the responsibility of the installer.

Product failure due to improper installation is not covered under the Warranty.

TOOLS YOU WILL NEED

Phillips screwdriver

IMPORTANT ELECTRICAL SAFETY—READ CAREFULLY

Zoneline Air ConditionersCAUTION:

Follow the National Electrical Code (NEC) or local codes and ordinances.

For personal safety, this Zoneline must be properly grounded.

Protective devices (fuses or circuit breakers) acceptable for Zoneline installations are specified on the nameplate of each unit.

Do not use an extension cord with this unit.

Aluminum building wiring may present special problems—consult a qualified electrician.

When the unit is in the OFF position, there is still voltage to the electrical controls.

Disconnect the power to the unit before servicing by:

1Removing the power cord (if it has one) from the wall receptacle.

OR

2Removing the branch circuit fuses or turning the circuit breakers off at the panel.

ZONELINE COMPONENTS

Zoneline unit

Room cabinet*

Power supply kit**

Exterior grille/louver**

Wall case**

** Shipped with the Zoneline unit

** Check the “Essential Elements” list on the unit

11

Page 11
Image 11
GE 2900 Before You Begin, Tools You Will Need, Zoneline Components, Installation Instructions, Zoneline Air Conditioners