GE AGMO5 Preparing to install the air conditioner, Before You Begin, Electrical Requirements

Models: AGMO5

1 40
Download 40 pages 59.01 Kb
Page 9
Image 9
Preparing to install the air conditioner.

Preparing to install the air conditioner.

Read these instructions completely and carefully.

Before You Begin

Safety Instructions

NOTE TO INSTALLER: Leave these instructions with the air conditioner after installation is completed.

NOTE TO CONSUMER: Keep this Owner’s Manual and Installation Instructions for future use.

IMPORTANT NOTES:

For personal safety, this air conditioner must be properly grounded.

It is important to have the wall outlet and circuit checked by a qualified electrician if there is any doubt as to whether a proper ground exists.

Follow National Electric Codes (NEC) and/or local codes and ordinances.

CAUTION:

Do not, under any circumstances, cut or remove the third (ground) prong from the power cord.

Do not change the plug on the power cord of this air conditioner.

Aluminum house wiring may present special problems—consult a qualified electrician.

Operating Instructions

Electrical Requirements

These models require 115/120-volt a.c.,

The 3-prong grounding plug minimizes the

60 Hz grounded outlet protected with

possibility of electric shock hazard. If the wall outlet

a 15-amp time delay fuse or circuit

you plan to use is only a 2-prong outlet, it is your

breaker.

responsibility to have it replaced with a properly

 

grounded 3-prong wall outlet.

Tools You Will Need

Phillips head screwdriver

Scissors

Flat blade screwdriver

Pencil

Ruler or tape measure

Level

9

Installation Instructions Troubleshooting Tips Consumer Support

Page 9
Image 9
GE AGMO5 Preparing to install the air conditioner, Before You Begin, Electrical Requirements, Tools You Will Need