GE JP950, JP340, JP940, JP930, JP910, JP355 Pre-Installationchecklist, Installation Instructions

Models: JP355 JP910 JP950 JP930 JP940 JP340

1 8
Download 8 pages 61.91 Kb
Page 3
Image 3
PRE-INSTALLATION CHECKLIST

Installation Instructions

PRE-INSTALLATION CHECKLIST

LiteratureWARNING – The electrical power to the cooktop supply line must be shut off while connections are being made. Failure to do so could result in serious injury or death.

1When preparing cooktop opening, make sure the inside of the cabinet and the cooktop do not interfere with each other. (See section on preparing the opening.)

2Remove packaging materials and literature package from the cooktop before beginning installation.

Literature

Package

Styrofoam

Packaging

Cooktop

3Remove Installation Instructions from literature pack and read them carefully before you begin.

Be sure to place all literature, Owner’s Manual, Installations, etc. in a safe place for future reference.

Before you begin-Read these instructions completely and carefully.

IMPORTANT- Save these instructions for local inspector's use.

IMPORTANT- OBSERVE ALL GOVERNING CODES AND ORDIANCES.

Note to Installer- Be sure to leave these instructions with the consumer.

OWNER- Keep these instructions for future reference.

Note- This appliance must be properly grounded (if applicable).

4Make sure you have all the tools and materials you need before starting the installation of the cooktop.

5Your home must provide the adequate electrical service needed to safely and properly use your cooktop. (Refer to section on electrical requirements.)

6When installing your cooktop in your home, make sure all local codes and ordinances are followed exactly as stated.

7Make sure the wall coverings, countertop and cabinets around the cooktop can withstand heat (up to 200°F) generated by the cooktop.

3

Page 3
Image 3
GE JP950, JP340, JP940 Pre-Installationchecklist, Installation Instructions, Literature Package Styrofoam Packaging Cooktop