30″COOKTOPS/DOWNDRAFT UNITSJVB93
Figure 2
Overall Cutout Dimensions
Figure 3
Cutout for Vent
Figure 1
Overall Cooktop Dimensions
1
2
3
NOTE: AGAINST-THE-WALLINSTALLATIONS ARE LIMITED DUE TO DIMENSION REQUIREMENTS.
REFER TO DETAILS BELOW.
PLANNING INSTALLATION (Note: 26″deep cabinets required) PREPARING CUTOUT
A B C B&C D IEF G H
(Figure 1) (Figure 1) (Figure 1) (Figure 1) (Figure 3) (Figure 2) (Figure 2) (Figure 2) (Figure 3) (Figure 3)
Min. Setback— DowndraftCooktop Cooktop Depth Front Edge Min. Req’d. Cooktop Cooktop Add’l Depth Cutout WidthOverall Overall Vent Cktop + Cntrtop to Front Inside Cabinet Cutout Cutout Req’d for Req’d fromModel No. Width Depth Depth* D.D. Vent Edge of Cutout** Clearance Width Depth Downdraft Centerline
JP326 301⁄4″211⁄4″21⁄8″233⁄8″21⁄2″227⁄16″281⁄2″195⁄8″23⁄4″271⁄16″
JP340
JP350 293⁄4″207⁄8″21⁄8″23″21⁄2″227⁄16″281⁄2″195⁄8″21⁄2″271⁄16″
JP930
JP938
JP350SC
JP930SC 297⁄8″211⁄2″21⁄8″235⁄8″21⁄2″227⁄16″281⁄2″195⁄8″25⁄8″271⁄16″
JP938SC
JGP328
JGP933 30″21″21⁄8″231⁄8″21⁄2″227⁄16″281⁄2″195⁄8″25⁄8″271⁄16″
JGP933S
JGP336 30″21″21⁄8″231⁄8″21⁄2″227⁄16″281⁄2″195⁄8″25⁄8″271⁄16″
JGP932 293⁄4″21″21⁄8″231⁄8″21⁄2″227⁄16″281⁄2″195⁄8″25⁄8″271⁄16″
JGP930S 30″211⁄4″21⁄8″233⁄8″21⁄2″227⁄16″281⁄2″195⁄8″23⁄4″271⁄16″
JGP932S 297⁄8″211⁄2″21⁄8″233⁄4″21⁄2″227⁄16″281⁄2″195⁄8″23⁄4″271⁄16″
*Includes 1/8″gap between cooktop and vent trim.
**Required to maintain UL or AGAapprovals.
6