Manuals
/
GE
/
Kitchen Appliance
/
Range
GE
PD968, PD900 installation instructions
Models:
PD968
PD900
1
15
16
16
Download
16 pages
11.22 Kb
9
10
11
12
13
14
15
16
<
>
Install
Using wire nuts
Checklist
Page 15
Image 15
NOTES
15
Page 14
Page 16
Page 15
Image 15
Page 14
Page 16
Contents
Installation
Installation Instructions
Pre-Installation Checklist
Inspect Installation Location
Move Range Indoors In Front of Cabinet Opening
Pre-Installation Cutout and Required Clearances
Standard Installation
Standard Installation Preparation
Electrical Connections
Connect the bare oven ground
Using wire nuts
With local code using wire nuts
Using wire nuts. If the residence red
Reinstall Junction box cover
Alternate Anti-tip installation
Standard Installation Instructions
D1 Installing the Anti-Tip Bracket
Anti-tip installation
D2 Install Stop Screw
Placing the Range into Opening
If provided
D5 Attach the Lower Trim
D6 Locating the Stop Screw
Stop Screw
Replacing the Oven Door
Operation Checklist
Final Checklist
Cabinets Over The Range
Island Installation
Alternate Construction Preparation
AA Optional Maintop Filler or Back- guard Kit
Page
31-10622-3