GE PD968, PD900 installation instructions Standard Installation Preparation

Models: PD968 PD900

1 16
Download 16 pages 11.22 Kb
Page 5
Image 5

Installation Instructions

B

Standard Installation Preparation

Standard Installation

 

Wall

 

 

 

Flat

 

 

Area

 

 

R

1/4Min.

 

 

Flat

 

 

23-3/16

25Typically

1/4

 

9/16Min.

9/16Min.

 

Flat

Flat

Range Support

29-15/16 30-1/16

Smooth Cut

Countertop

The Standard Installation of this Drop-In Range is to hang by the countertop on the side metal flanges under glass cooktop.

This Range must not be installed on a base or sub structure (2x 4support).

If the construction of your cabinet cannot provide a 1/4” flat area at the back of the countertop opening, consider changing the countertop to accommodate this dimension. If the area is not flat, excess tension may be applied to the glass cooktop, causing breakage and voiding the warranty.

 

Braces secured between the

 

underside of the countertop and

 

the cabinet if required to obtain

 

1-1/4minimum thickness (two

 

sides)

 

Center the 30” wide opening over the ad-

B1

 

jacent cabinets and mark with a straight

 

 

edge.

 

Using a straight edge, mark the back line at

B2

 

23-3/16” from the front edge of the counter.

 

 

Be careful not to damage the adjacent

B3

 

cabinets while cutting the countertop.

 

Remove countertop raised edge, if

B4

incorporated. (See illustration on page 4)

5

Page 5
Image 5
GE PD968, PD900 installation instructions Standard Installation Preparation