GE PVWS930, PVWT936, PVWG936, PVIG940, PVWS936 Ceiling Installation, Installation Instructions

Models: PVWS936 PVIG940 PVWG936 PVWS930 PVWT936

1 24
Download 24 pages 5.87 Kb
Page 16
Image 16
CEILING INSTALLATION -

Installation Instructions

CEILING INSTALLATION -

Continued

Ø 6 x 80

Ø 3.5 x 9.5

11.Insert the other chimney and keep it raised. Fix the low connector to the connection box. Then fasten the outlet duct onto the transition.

12.Bring the canopy together with the telescopic structure, and fasten them together using 4 screws (M8 x 16).

Then you can carry out the electrical connection

(consult Step 19 of“WALL INST ALLATION”instructions on previous page).

13.Lower the chimney and fasten it on the sides to the hood.

M8 x 16

14.Install the glass vapour catcher with 4 screws and bushes, place the rubber tape between the canopy metal edge and the glass (see drawing )

1 6

Page 16
Image 16
GE PVWS930, PVWT936, PVWG936, PVIG940, PVWS936 installation instructions Ceiling Installation, Installation Instructions