GE XL44 manual When All Hookups Are Completed, Make Sure All Controls Are Left In The Off Position

Models: XL44

1 48
Download 48 pages 12.36 Kb
Page 41
Image 41
WHEN ALL HOOKUPS ARE COMPLETED:

For cement or concrete construction, you

will need a 1/4″ x 112″ lag bolt and a 1/2″ O.D. sleeve anchor, which are not provided. Drill the recommended size hole for the hardware.

Install the sleeve anchor into the drilled hole and then install the lag bolt through the device. The bolts must be properly tightened as recommended for the hardware.

Wallboard

Back of

 

range

Anti-Tip device

Wood screw

Wallplate

5.Slide the range against the wall, and check for proper installation by grasping the front edge of the cooktop and carefully attempting to tilt the range forward.

WHEN ALL HOOKUPS ARE COMPLETED:

MAKE SURE ALL CONTROLS ARE LEFT IN THE OFF POSITION.

MAKE SURE THE FLOW OF COMBUSTION AND VENTILATION AIR TO THE RANGE IS UNOBSTRUCTED.

CONVERTING TO LP GAS

(or converting back to natural gas from LP)

This range leaves the factory set for use with natural gas. If you want to convert to LP gas, the conversion must be performed by a qualified LP gas installer.

The conversion instructions and LP orifices can be found attached to the range next to the pressure regulator.

Keep these instructions and the orifices in case you want to convert back to natural gas.

41

Page 41
Image 41
GE XL44 manual When All Hookups Are Completed, Make Sure All Controls Are Left In The Off Position, Converting To Lp Gas