Installation
Beverage Center & Wine Chiller
Step1
Remove the Packaging
Remove all packing material and tape.
Tools and materials required:
• #2 Phillips screwdriver
Parts List:
A. Stainless tubular handle | |
B. 2 | Handle standoffs |
C. 3 | Screws for mounting handle standoffs |
(2 required, 1 extra) | |
D. 3 | Set screws (2 required, 1 extra) |
E. 3/32" Allen wrench for set screws |
B.C.
D.
F. E.
F. | 4 | |
G. | 4 | Leveling legs |
H. GE Monogram nameplate | A. |
I.8 Plug buttons
J.Hinge Shims
K.2 Screws for light trigger hole
CAUTION: Small objects are a choke hazard to children. Remove and discard any parts not used.
H.
I.
G.
PRUDENCE – Les petits objets | J. |
K | |
peuvent étrangler les enfants. Il faut |
|
jeter toutes les pièces qui ne sont pas |
|
utilisées. |
|
Step2
Install Handle
Note: Consider door swing direction. If you wish to change door swing, complete the instructions shown on page 5 before installing the handle.
•Place handle standoff against the top screw hole in the door. Position the standoff so that the small screw hole points toward the floor.
•Drive screw through the standoff and into the door. Do not tighten.
•Install bottom standoff. Do not tighten.
•Place handle to standoffs so that handle mount- ing posts are inserted into the standoffs. The handle should fit into the curved shape of the standoff. Again, the set screw hole should be pointing downwards.
•Remove the handle and tighten standoffs to door.
•Place handle to standoffs and install set screws through the bottom of standoffs using the allen wrench provided.
•The handle should be tight against the standoff.
•Save the allen wrench for future use.
Screw
Allen Wrench
6