GE Monogram ZEU30R Contents, Models Available, Advance Planning, Design Information

Models: ZEU30R

1 8
Download 8 pages 46.77 Kb
Page 3
Image 3
Design Information

 

 

Design Information

 

 

Electronic Radiant Cooktop

 

Design Information

 

Contents

Models Available

3

 

Advance Planning

3

 

Tools & Materials Required

4

 

Preparing the Opening

 

 

Minimum Clearances

4

 

Overall Cooktop Dimensions

4

 

Vertical Clearance

5

 

Cutout Dimensions

5

 

Wall Coverings, Countertop & Cabinets

5

 

Installation

 

 

Installing Junction Box

5

 

Protecting the Surface of the Cooktop

5

 

Attach Foam Strips

6

 

Locate Mounting Parts

6

 

Attach Brackets to Cooktop

6

 

Insert the Cooktop into Cutout

6

 

Attach the Hold Down Bracket

6

 

Electrical Connections

7

 

Checking Installation & Cooktop Operations

8

Models Available

ZEU30R

Electronic Radiant Cooktop

Advance Planning

The electrical power to the

!cooktop supply line must be shut off while connections are being made. Failure to do so could result in serious injury or death.

When preparing cooktop opening, make sure the inside of the cabinet and the cooktop do not interfere with each other. (See section on preparing the opening.)

Remove packaging materials and literature package from the cooktop before beginning installation.

Literature Package

Styrofoam

Packaging

Cooktop

Remove Installation Instructions from literature pack and read them carefully before you begin.

Be sure to place all literature, Owner’s Manual, Installation Instructions, etc. in a safe place for future reference.

GE Monogram®

Installation

Instruction

30" Electric

Radiant Cooktop

Model ZEU30R

Make sure you have all the tools and materials you need before starting the installation of the cooktop.

Your home must provide the adequate electrical service needed to safely and properly use your cooktop. (Refer to section on electrical requirements.)

When installing your cooktop in your home, make sure all local codes and ordinances are followed exactly as stated.

Make sure the wall coverings, countertop and cabinets around the cooktop can withstand heat (up to 200°F) generated by the cooktop.

3

Page 3
Image 3
GE Monogram ZEU30R Contents, Models Available, Advance Planning, Design Information, The electrical power to the