Section 3 – Post-installation Start-up Checks

IMPACT-36 plus II Recreational Vehicle Generator

3.5INSTALLATION CHECKLIST

LOCATION AND SUPPORT

Generator is properly located.

Generator is properly supported.

Generator is properly restrained.

GENERATOR COMPARTMENT

Compartment construction is proper.

Holes/Openings are vapor-sealed.

Compartment size is correct.

Compartment is vapor-sealed.

Sound insulation is correct.

Floor cutouts are properly completed.

COOLING AND VENTILATING AIR

Airflow is adequate.

Air inlet opening is correct.

Compensate for restrictions.

Check that installation has been tested.

DIESEL FUEL SYSTEM

Fuel tank complies with all applicable codes.

Fuel system is properly installed and checked for leaks.

EXHAUST SYSTEM

Exhaust system complies with all applicable codes.

Exhaust system is properly and safely installed.

ELECTRICAL CONNECTIONS

Connections comply with local code requirements and all National Electrical Codes.

Junction box is properly installed.

Wiring meets all standards.

All connections are correct.

Conduit is properly installed and sealed.

Generator is properly bonded to the vehicle.

BATTERY INSTALLATION

Recommended battery is installed.

Recommended cables are installed.

Cables are clean and tight.

Cables are connected properly.

Proper ventilation is provided.

Terminals are coated with anti-corrosion grease, and terminal covers are positioned.

OPTIONAL ACCESSORIES

Check that remote start/stop panels (if used) are installed properly.

Check that all other options and accessories (if used) are installed properly.

POST INSTALLATION TESTS

Check that all tests are completed properly.

DATE OF INSTALLATION ____________________________________________________

NAME OF INSTALLER ______________________________________________________

SIGNATURE OF INSTALLER ________________________________________________