2.It"bakery TsequTppedwTth yen= caps, make sure =hey are Jnsr_lled and are tTght.
3.It"necessary, clean battery termTnals.
4.Connec= battery charge cable connec=or plug to panel recep_cle identified by the words
S.Connect bat_ry charge cable clamp with red handle _o the positive (+) battery terminal (Figure 6),
6.Connect battery charge cable clamp with black handle _o the negative
7.Start engine, let engine run while bz_tery recharges.
8.When battery has charged, shut down engine
NOTE: Use an amomod_ hydrometer _o _st battery s_a_e of charge and condition. Follow the hydrometer m_nofaztzrer's instrucUons care4ully.Gener_l_ a b_'_eryis considered _o be at 100% state of charge when specific gr_Ly of_ fluid (_ measured by hydrometer) is 1_260or higher.
Build a structure that will enclose three sides and the top of the genera_0r.
I.Make sure entire
2.Ensure a minimum of _wo feet clearance between open side of box and nearest obiec=
3.Face exposed end away from wind and elements.
4.Enclosure should hold enough heat created by generator to prevent problems.
DANGER
COLD WEATH ER
OPERATION
Under cer!_in weather conditions(t_mperatures below
40OF[4=C] and a high dew point),your generator may
experience icing of the c_rburetor and/or the crankcase breather system.
.Keep at:!eas t 2 "_ec_of clearance on al!sides Ofg_n_rator for _d_qUateventilati0n.
,DO NOT Oper_e gen_r_or insidoaw buildingOrendc_i !ncluding_ gene_r comparm_ c_z _rr._or_J v_icl_ _RV).
,P,_m0vegener_t0rromShelterwhen _emperatureiSabove