Golden Technologies GL140, GL110 Reinstall the Drivetrain, Drivetrain Alignment, Raise the Tiller

Models: GL110

1 43
Download 43 pages 53.05 Kb
Page 28
Image 28
Reinstall the Drivetrain

LiteRider™ Owner’s Manual

Rev.A_122810

VIII. ASSEMBLY

Reinstall the Drivetrain

1.Line up the two yellow tabs on the frame, with the two grooves on the drivetrain, one on each side of the scooter. See figure 20.

 WATCH FINGER PLACEMENT! BE CAREFUL NOT TO PINCH YOUR FINGERS! WATCH FINGER PLACEMENT! BE CAREFUL NOT TO PINCH YOUR FINGERS!

2.Lower the frame onto the drivetrain until the drivetrain release lever engages. You should hear an audible click.

Figure 20. Drivetrain Alignment

Figure 21. Battery Pack Installation

Install the Battery Pack

3. Gently lower the battery pack onto the frame. See figure 21.

Raise the Tiller

4.Loosen the tiller adjustment knob and raise the tiller. See #1 on figure 22.

5.Tighten the tiller adjustment knob at the desired position.

Figure 20. Drivetrain Alignment– MAKE SURE YOU TIGHTEN YOUR TILLER KNOB TO BE SURE IT IS SECURED IN THE DESIRED POSITION!

Tiller lock in unlocked position.

1

2

Figure 22. Tiller Raised and Unlocked

27

Page 28
Image 28
Golden Technologies GL140, GL110 Reinstall the Drivetrain, Watch Finger Placement! Be Careful Not To Pinch Your Fingers