6.Identify the Left Handlebar (8), which is marked with a “Left” sticker. Insert the Left Handlebar into one of the Handlebar Legs (11) as shown.

Attach the Left Handlebar (8) with two M8 x 42mm Bolts (71) and two M8 Nylon Locknuts (96). Make sure that the Nylon Locknuts are inside the hexagonal holes.

Assemble the Right Handlebar (not shown) and the other Handlebar Leg (not shown) in the same way.

7.Position an Inner Handlebar Cover (18) and an Outer Handlebar Cover (19) around the Left Handlebar (8) as shown.

Attach the Inner and Outer Handlebar Covers (18, 19) with three M4 x 16mm Self-tapping Screws (79) and an M4 x 13mm Washer (93).

Start all three Self-tapping Screws before tightening them.

Repeat this step for the Right Handlebar (not shown).

6

8

Hexagonal

Hole

96

Hexagonal

Hole

1171

7

18 79

8

19 79 93

8

Page 8
Image 8
Gold's Gym GGEL60407.1 manual Hexagonal Hole 1171 19 79