Gold's Gym 580, GGVB5978.0 manual Assembly

Models: 580 GGVB5978.0

1 12
Download 12 pages 43.76 Kb
Page 5
Image 5

ASSEMBLY

Make sure that the power cord is unplugged. Assembly requires two persons. Set the vibration platform in a cleared area and remove all packing materials. Do not dispose of the packing materials until assembly is com- pleted.

Assembly requires only the included tools.

Use the drawings below to identify the assembly hardware. The number in parentheses below each drawing is the key number of the part, from the PART LIST near the end of this manual. Note: If a part is not in the hard- ware kit, check to see if it is preattached to one of the parts to be assembled. Extra hardware may be included.

To avoid damaging plastic parts, do not use power tools for assembly.

M6 x 15mm Screw (38)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

M8 x 16mm Allen

 

 

 

B

 

olt (39)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

M6 Flat Washer

 

(45)

SW6 Split Washer (44)

M8 Flat Washer

 

(33)

 

 

 

SW8 Split Washer (34)

 

 

 

1.Insert the Upper Wire (47) downward into the Upright (1).

Attach the Console (3) to the Upright (1) with two M6 x 15mm Screws (38), two SW6 Split Washers (44), and two M6 Flat Washers (45).

1

3

45 44

47

1

38

 

5

Page 5
Image 5
Gold's Gym 580, GGVB5978.0 manual Assembly