![](/images/new-backgrounds/1057878/5787825x1.webp)
8.Set thermostat knob (TK) to desired spray material conditioning temperature. Align temperature setting to set point (SP).
NOTE: Set point (SP) is a “V” notch in the metal bracket at the top of the thermostat dial. Maximum setting is 140°F (60°C).
303
SP
TK
L HC
FIG. 14: Connect Immersion Heater
Installation
BA
BB
302
303
FIG. 15: Immersion Heater Power Cables
9.Install immersion heater cover (HC) with screws (HS). See FIG. 13.
10.Open junction box door and remove plug for appro- priate heater wire. Install cord grip of bushing (302). Route power cable (303) up through cord grip.
11.Press the top lever up on the power switch body (BA, BB) and pull away from the junction box. Install by pushing the power switch body onto the switch lever post. Flip lever down to engage.
12.Loosen lugs 2 and 4 on immersion heater A power switch (BA) or immersion heater B power switch (BB). Insert power leads and tighten lugs.
13.Connect green wire to 102GND grounding lug.
Feed Pump and Agitator Kits
See manual 312769 for installation and operation instructions.
312747L | 13 |