
Setup
| 5. Route power cable (3) up through cord grip (JC). | 7. Connect power wiring from 1L1 and 3L2 to terminal | 
| 
 | blocks 1 and 3 in TB1. | 
6.Connect other end of grounding wire to grounding lug nut (X) inside junction box (J).
TB1 
 J
J
X

C 
3JC
| D | 3L2 | 3L2 | 
1L1
C
2
 PE
 PE
ti20975a
FIG. 4: Heat Control Box Cable Connections
| 6 | 313258C | 
