Installation

Assembling Pail Mount Units

1.Insert the suction tube (27) into the elbow (15) to its full depth. Tighten the nut securely. See Fig. 1.

2.Insert the recirculation tube (28) into the connector (16) to its full depth. Tighten the nut securely.

3.On Models 236–870 and 224–833, assemble the Fluid Regulator Kit (items 17, 21, 24 and 32) as shown in Fig. 1.

4.Attach the pail cover (2) to a pail of fluid, using the thumbscrews (3). Tighten securely.

Model 236–412

 

Models 236–870

 

 

and 224–833

22

￿

Tighten nut securely with wrench.

2Apply thread sealant to male threads.

22

16 ￿

17

24 2

32

2

21 2

16 ￿

3 2 27

15 ￿

28

2

27

3

15 ￿

28

Fig. 1

￿4964

￿4965

4￿￿8￿￿￿￿

Page 4
Image 4
Graco Inc 236-414, 308-230, 236-628, 236-868, 236-870, 236-869, 236-412, 224-833 manual Installation, Assembling Pail Mount Units