Grindmaster 830, 815, 850 service manual Page American Metal Ware Hot Water Boiler

Models: 830 850 815

1 16
Download 16 pages 36.41 Kb
Page 10
Image 10
Page 9

Page 9

American Metal Ware Hot Water Boiler

IV) Trouble Shooting Auto Refill, Low Water Cutoff, and Dual Level Control System (continued)

PROBLEM

POSSIBLE CAUSE

SERVICE CHECK

REMEDY

 

 

 

 

 

C) Auto refill fails to

3)

Water strainer clogged.

Water pressure before

Remove and clean micromesh screen

fill water tank

 

 

strainer and not after.

filter located in water strainer.

(continued).

 

 

 

 

4)

No power on Dual

Check for 120V AC across

If voltage missing or incorrect,

 

 

 

Level Control.

“H” and “N” terminals.

check wiring for looseness, breaks,

 

 

 

 

and proper connections.

 

 

 

 

 

 

5)

Fill solenoid valve

Disassemble.

Clean out and/or replace plunger

 

 

clogged with scale

 

assembly or entire valve. May require

 

 

or frozen closed.

 

new coil. Caution is advised to avoid

 

 

 

 

damage to valve. See valve instruction

 

 

 

 

sheet.

 

 

 

 

 

 

6)

Fill solenoid valve

Jumper from “FILL”

Replace coil. Also check for frozen

 

 

coil inoperative

terminal to “H” terminal

plunger. See valve instruction sheet.

 

 

 

does not start fill.

 

 

 

 

 

 

 

7)

Electrodes shorting to

Tank fills with electrode

Replace electrode assembly. If no

 

 

ground.

wire disconnected from

remedy, check for improper wiring

 

 

 

“HI” terminal.

(cut insulation) or electrode tips

 

 

 

 

touching metal.

 

 

 

 

 

 

8)

Dual Level Control

Tank does not fill

Replace Dual Level Control.

 

 

faulty.

with electrode wire

 

 

 

 

disconnected from “HI”

 

 

 

 

terminal.

 

 

 

 

 

 

D) Auto Refill is erratic.

1)

Electrode shorting to

Tank fills with

Replace electrode assembly.

 

 

ground completely or

electrode wire

 

 

 

intermittently.

disconnected from “HI”

 

 

 

 

terminal

 

 

 

 

 

 

 

2)

Loose connection.

Visual. Check for “C” and

Push wire lead connector securely

 

 

 

“HI” probe terminals as well

onto terminal(s). Replace connector

 

 

 

as “FILL.” Also check

if wire is frayed or broken.

 

 

 

neutral (white) wire at valve.

 

 

 

 

 

 

 

3)

Dual Level Control

Tank does not fill with

Replace Dual Level Control.

 

 

faulty.

electrode wires disconnected

 

 

 

 

from “XL” and “H” terminals.

 

 

 

 

 

 

Page 10
Image 10
Grindmaster 830, 815, 850 service manual Page American Metal Ware Hot Water Boiler