Upper Juntion Box, Top Auger Motor Conduit, & Operator Light

Top auger motor conduit.

Upper junction box.

1

 

 

 

 

3

4

 

5

6

Operator light.

 

 

Fill switch assembly (installed).

 

 

7

9

12

 

 

 

 

2

 

 

10

 

 

 

 

 

9

 

1

11

 

 

 

 

 

 

2

 

 

 

 

 

 

15

11

10

1

2

8

Fill switch assembly (opened).

13

14

Items 9 - 14 are components of the mercury switch box assembly (fill switch assembly) part no. D01-0192.

9

ITEM No.

DESCRIPTION

PART No.

 

 

 

1

CONDUIT 1/2" EMT METALLIC

D03-0057

2

CONNECTOR 1/2" EMT COMPRESSION

D03-0054

3

CLAMP 1/2" CONDUIT

HH-1096

4

CONNECTOR 1/2" EMT TO SEALTITE

D03-0075

5

SEALTITE PVC 1/2"

FH-7039

6

ELBOW 1/2" 90 DEGREE PVC WITH

FH-7052

7

LAMP 90 DEGREE W/JUNC.BOX

D03-0117

8

BULB, 100W 130V ROUGH SERVICE

D03-0575

9

ENCLOSURE 4x4x2.5 WHITE PVC

FH-6972

10

CONNECTOR 1/2"

FH-1310

11

WIRE 18/2 TYPE SJOW-A BLACK

WR-182SJOWA

12

MOUNTING PLATE WLDMNT, MERC.BX

D01-0358

13

MERCURY SWITCH 6-DEG. 6" LEADS

D03-0010

14

CLIP MERCURY SWITCH

SPD-2098

15

MERCURY SWITCH SHAFT

D01-0103

54

PNEG-1447

Page 53
Image 53
GSI Outdoors PNEG-1447 manual Upper Juntion Box, Top Auger Motor Conduit, & Operator Light