GSW 61009 REV. C (09-03) G, H, J, Offset vent pipe arrangement, K - Condition, L - Condition

Models: 61009 REV. C (09-03)

1 17
Download 17 pages 44.2 Kb
Page 8
Image 8
Figure 3G

Figure 3G

Pull and connect the 80mm (3-1/8 in.) corrugated pipe to the water heater’s flue tube reducer with hi-temp red silicone and gear clamp. Make sure this connection is tight and leak proof.

*The sealant between 80mm (3-1/8 in.) corrugated pipe and water heater’s flue tube reducer must be hi-temp red sili- cone or other material suitable for 315°C (600°F) continu- ous service.

Figure 3H

Apply silicone around 152mm (6 in.) collar on air manifold box. Pull corrugated vent tube all the way on to collar and secure with one sheet metal screw (approx. 19mm (3/4 in.) up from edge of vent tube. Pull gear clamp past screw and tighten.

SLOPE

Figure 3J

Check the vent pipe’s level or slope again, and adjust if required.

Offset vent pipe arrangement

TOP VIEW

90° MAXIMUM

BEND

Figure 3K - CONDITION 1

Where a straight vent pipe arrangement is impossible, a horizontal 90 degree maximum bend can be made. Use the water heater casing outer diameter as a template to form the corrugated pipe.

>25mm (1 in.)

>25mm (1 in.)

 

WALL 254mm (10 in.) (REF)

MINIMUM

1.72m (68 in.) FOR

40 gal. MODELS,

1.93m (76 in.) FOR

50 gal. MODELS.

Figure 3L - CONDITION 2

Where floor joists impede venting, a rise to complete the vent termination is possible. All installations require 25mm (1 in.) clearance to combustibles.

Note:

A.The maximum horizontal vent pipe length of 2.28m (90 in.) minus wall thickness should be considered when installing an offset vent arrangement.

B.Do not combine condition 1 (3K) with condition 2 (3L) in the same installation.

– 8 –

Page 8
Image 8
GSW 61009 REV. C (09-03) manual G, H, J, Offset vent pipe arrangement, K - Condition, L - Condition