WIRING THE SECOND OPERATOR

When the units are set in place and you have completed wiring the first unit follow the instructions below.

Step 1: With the PRO SL-1000 or SL-2000 control box open, use a screw driver to punch out the round knockout hole located on the bottom next to the First Operator power cable. Install the strain relief for the Second Operator power cable. Leave about 6Ó of the power cable and tighten the strain relief nut to secure the wires.

Wire From Second Operator Battery

Relief

Lock Nut

Strain

Hub

 

 

Sealing Nut

Lock Nut

Hub

Sealing Nut

First Operator Power Cable

Second Operator Power Cable

THIS STEP IS FOR SL-2000/ 2200 INSTALLATION ONLY

Step 1a: Run the battery jumper wire through the PVC from the battery in the Second Operator to the battery in the First Operator. Use the side strain reliefs on the control boxes to run battery jumper wire into control boxes. Using spade connectors, connect positive to positive and negative to negative.

 

 

 

 

 

 

 

 

SEQ1

ON

 

 

 

 

 

 

OPNEDG

 

BLK ORG BLU GRN CLSEDG OPNEDG

 

SEQ2

 

LEARN

 

 

RED

BLK ORG BLU GRN CLSEDG

RED

GRN ORG

BLU WHT

 

~ ~ –

+

 

 

18VAC SOLAR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

R

B

G

POWER IN

FIRST OPERATOR

 

SECOND OPERATOR

ALARM ACCESSORY

 

RCVR

RED

BLACK

ORANGE

BLUE

GREEN

RED

BLACK

ORANGE

BLUE

GREEN

Low Voltage Wire

from AC Transformer

Power Cable

Power Cable

from First Operator

from Second Operator

Step 2: Run the second power cable through PVC conduit to the Second Operator. Con- nect the wires to the motor and limit switches as shown in illustration

Limit Nut A

Limit Nut B

Open position stop Ð

Closed position stop Ð

if gate opens right to left.

if gate opens right to left.

Closed position stop Ð

Open position stop Ð

if gate opens left to right.

if gate opens left to right.

Limit Switches

BLUE (N/O contact)

GREEN (common)

Motor

ORANGE (N/O contact)

BLACK to Motor RED

RED to Motor BLACK

Step 3: Adjust the DIP switches on the First Operator control board for the appropriate dual gate settings, follow- ing the directions on next page.

Second Operator

Power Cable

35

Page 38
Image 38
GTO SL-1000 installation manual Wiring the Second Operator, This Step is for SL-2000/ 2200 Installation only

SL-1000, SL-2000 specifications

The GTO SL-2000 and SL-1000 are advanced gate operators designed for efficient and reliable automation of heavy-duty swing gates. These models are renowned for their robust construction and innovative technologies that enhance both performance and security.

The SL-2000 is particularly suited for large, dual-swing gates weighing up to 2,000 pounds, making it a perfect choice for commercial and industrial settings. In comparison, the SL-1000 is designed for lighter gates that weigh up to 1,000 pounds, suitable for residential and light commercial applications. Both models are engineered to provide smooth, quiet operation, which is vital for residential areas where noise reduction is essential.

One of the standout features of both the SL-2000 and SL-1000 is their advanced DC motor technology. This allows for variable speed operation, providing a slower, more controlled movement during the opening and closing cycles. Such functionality not only enhances safety but also minimizes wear and tear on the gate mechanism, ensuring longevity.

Both models are equipped with obstacle detection technology that halts the gate's movement if an obstruction is encountered. This safety feature helps prevent accidents and damage, a critical aspect in environments where individuals and vehicles are present.

In terms of installation, the GTO SL series is designed for ease of use, featuring a straightforward setup process with clear instructions and minimal tools required. Additionally, the SL-2000 and SL-1000 include a built-in rechargeable battery backup, ensuring that the gate operates even during power outages.

Security is a top priority with both gate operators. They incorporate rolling code technology in their remote controls, which changes the access code with each activation, significantly reducing the risk of unauthorized access. Furthermore, the SL series supports multiple remote controls, allowing for convenient access for users while maintaining security.

Durability is another hallmark of the GTO SL-2000 and SL-1000. Both operators are built with weather-resistant materials, ensuring they can withstand various environmental conditions. This resilience makes them a solid investment for long-term use.

In conclusion, the GTO SL-2000 and SL-1000 are state-of-the-art gate operators that combine cutting-edge technology with superior safety features, making them a reliable choice for enhancing the automation of swing gates in diverse applications. Their ease of installation, robust construction, and advanced functionalities are significant advantages for property owners seeking secure and efficient access solutions.