Haier AD36NAMBEA(ECO) Installation Manual For Indoor Unit, Installation of indoor unit

Models: AD182AMBEA(ECO) AD242AMBEA(ECO) AD28NAMBEA(ECO) AD36NAMBEA(ECO) AD42NAMBEA(ECO)

1 19
Download 19 pages 16.73 Kb
Page 16
Image 16
(5) Installation of indoor unit

Adjusting to the levelness Installation Manual For Indoor Unit

(5) Installation of indoor unit

M10 nut

Fix the indoor unit to the hanger bolts.

If required, it is possible to suspend the unit to the beam, etc.

Directly by use of the bolts without using the hanger bolts.

Main unit

Note

Hanging bolt M10 washer

M10 spring washer

When the dimensions of main unit and ceiling holes does not match, it can be adjusted with the slot holes of hanging bracket.

Adjusting to the levelness

(a)Adjust the out-of levelness using a level or by the following method.

Make adjustment so that the relation between the lower surface of the unit proper and water level in the hose becomes as given below.

Piping side Supply water Tap selection on blower unit(When the high performance filter is used.)

Water level

0~5 mm

PVC hose

 

(0~0.2")

Bring the piping side slightly lower.

(b)Unless the adjustment to the levelness is made properly, malfunctioning or failure of the float switch may occur.

Tap selection on blower unit

(When the high performance filter is used.)

Taps of blower unit are set at the standard selection at the shipping from factory. Where the static pressure is raised by employing such option as the high performance filter, etc., change the connection of connectors provided at the flank of control box as shown below.

 

Standard tap (at shipping)

 

 

High speed tap

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Control box side

White

 

 

White

 

 

White

 

 

 

Black

 

Blue

Connector white

White

Blue

Moter side

 

Blue

Connector white

 

 

White

Moter side

Yellow

Yellow

 

Yellow

Red

 

Blue

Red

Red

 

Red

 

Red

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(6)Drain Piping

(a)Drain piping should always be in a downhill grade (1/50~1/100) and avoid riding across an elevation or making traps.

Good piping

Inproper piping

Suspension 1.5m ~ 2m

 

bolts

Avoid riding across an elevation

 

 

 

Air vent

 

 

Keep free from traps

 

Heat

A downhill grade

 

 

 

 

Do not pipe under water

 

 

 

 

 

 

 

 

 

insulation

of 1/100 or more

 

 

 

 

 

 

 

(b) When connecting the drain pipe to unit, pay suffcient

 

 

 

 

 

 

 

 

attention not to apply excess force to the

 

 

 

Stage

 

 

 

piping on the unit side. Also, fix the piping at a

 

 

Drain socket

difference

Drain hose

 

point as close as possible to the unit.

 

 

part

 

 

 

(c)

 

Drain socket

 

 

 

 

For drain pipe, use hard PVC general purpose pipe

 

 

 

 

VP 25 joint

 

 

Pipe cover(large)

 

 

VP-25(I.D.1") which can be purchased locally. When

 

 

 

(field purchased)

 

 

 

[for insulation]

 

 

 

connecting, insert a PVC pipe end securely into the

Main unit

(accessory)

 

 

 

 

 

 

 

 

 

drain socket before tightening securely using the

 

 

 

 

 

 

VP 25

 

attached drain hose and clamp. Adhesive must not

 

 

 

Drain hose

 

 

 

 

 

 

(field purchased)

 

be used connection of the drain socket and drain

 

 

Clamp (accessory)

 

 

 

 

 

(accessory)

Adhesion

Pipe cover

 

hose (accessory).

 

 

Pipe cover(small)

 

 

[for insulation]

 

 

 

 

 

(field purchased)

 

 

 

 

 

[for insulation]

 

 

 

 

 

 

 

 

(accessory)

 

 

 

15

Page 16
Image 16
Haier AD36NAMBEA(ECO) Installation Manual For Indoor Unit, Installation of indoor unit, Adjusting to the levelness