7. Pipe Vacuumizing

Installation Precedure

Outdoor Unit

7. Pipe Vacuumizing

Manual background Use vacuum pump to evacuate the air. Never use the refrigerant for the evacuation.

Manual background Drain off the nitrogen gas after the leak test and then connect the vacuum pump as shown in the figure below. Manual background The vacuum pumping must be done from both the liquid and gas inlets.

 

 

 

 

Low-pressure gauge High-pressure gauge

 

 

 

 

Three-way valve fully closed

 

 

Indoor

Outdoor

 

(gas side)

VL VH

Gauge distributor

 

 

 

 

 

 

Tightly

 

 

 

6.4Copper pipe

 

 

 

 

Solder

 

 

6.4Copper pipe

closed

Solder joint

 

 

joint

 

 

Access hole

 

 

 

 

 

 

 

 

 

 

 

 

 

 

P

Tightly

 

 

Tightly

 

 

Vacuum pump

closed

Solder joint

 

 

closed

Access hole

 

 

 

 

 

 

 

 

 

 

 

 

 

Indoor unit

 

 

 

 

 

 

 

 

 

 

Outdoor unit

 

 

 

 

 

 

Three-way valve fully closed

 

 

 

 

 

 

liquid side

 

 

Detailed diagram of the three-way valve

 

 

To the gauge distributor

 

 

(Gas side) access hole

 

 

 

 

(Gas side) three-way valve

 

 

 

 

 

 

 

(Liquid side)access hole

 

 

 

To the unit

 

 

(Liquid side)three-way valve

 

 

 

 

 

 

 

 

 

 

 

unitthe oT

 

 

 

 

Field tube

Field tube

 

 

 

installation

installation

 

 

 

Manual background Use a vacuum pump with high degree of vacuum(below-755mmHg) and large volume displacement (above 40L/min).

Manual background The pumping time depends on the length of the connecting pipe. Generally, it takes about 2-3 hours. Make sure that the Y-shaped valves on both the gas and liquid sides are closed before pumping.

Manual background If the vacuum can no reach-755mmHg within 2 hours, continue pumping for another 1 hour.

Manual background If the vacuum can no reach-755mmHg after more than 2 hour's pumping, close the valves VL and VH on the gauge distributor and stop pumping. One hour later, check the vacuum again. If the vacuum has changed, it means there is a leakage. Repair it. Manual background After the above steps, replace the vacuum pump with the refrigerant pump and refill refrigerant.