![7. Pipe Vacuumizing](/images/new-backgrounds/32610/3261047x1.webp)
Installation Precedure
Outdoor Unit
7. Pipe Vacuumizing
Use vacuum pump to evacuate the air. Never use the refrigerant for the evacuation.
Drain off the nitrogen gas after the leak test and then connect the vacuum pump as shown in the figure below.
The vacuum pumping must be done from both the liquid and gas inlets.
|
|
|
| |||
|
|
|
|
|
| |
Indoor | Outdoor |
| (gas side) | VL VH | Gauge distributor | |
|
|
|
|
|
| |
Tightly |
|
|
| 6.4Copper pipe |
|
|
|
| Solder |
|
| 6.4Copper pipe | |
closed | Solder joint |
|
| |||
joint |
|
| ||||
Access hole |
|
| ||||
|
|
|
|
|
| |
|
|
|
|
|
| P |
Tightly |
|
| Tightly |
|
| Vacuum pump |
closed | Solder joint |
|
| |||
closed | Access hole |
|
| |||
|
|
|
|
| ||
|
|
|
|
|
| |
Indoor unit |
|
|
|
|
|
|
|
|
|
| Outdoor unit |
|
|
|
|
|
|
|
| |
|
|
|
| liquid side |
|
|
Detailed diagram of the |
|
| ||||
To the gauge distributor |
|
| (Gas side) access hole |
|
| |
|
| (Gas side) |
|
| ||
|
|
|
|
| ||
(Liquid side)access hole |
|
|
| To the unit |
|
|
(Liquid |
|
|
|
| ||
|
|
|
|
| ||
|
| unitthe oT |
|
|
|
|
Field tube | Field tube |
|
|
| ||
installation | installation |
|
|
|
Use a vacuum pump with high degree of
The pumping time depends on the length of the connecting pipe. Generally, it takes about
If the vacuum can no
If the vacuum can no
After the above steps, replace the vacuum pump with the refrigerant pump and refill refrigerant.
23