Haier HBU-48CK03 3Preparation for the installation, Installation Procedure, 950Ornament panel

Models: HBU-42CI03 HBU-28CH03 HBU-28HH03 HBU-48CH03 HBU-36HH03 HBU-42HI03 HBU-42CH03 HBU-48CK03 HBU-48HJ03

1 28
Download 28 pages 45.33 Kb
Page 19
Image 19
3Preparation for the installation

950(Ornament panel)890(Ceiling opening) 840(Indoor unit) Installation Procedure

3Preparation for the installation

(1) Position of ceiling opening between unit and suspending bolt.

Unit:mm

 

 

950(Ornament panel)

890(Ceiling opening) 840(Indoor unit)

bolts)

Refrigerant pipe

 

between

 

780 (Distance suspending

drain pipe

Suspending bolts

 

 

*

 

 

 

 

 

680

 

 

 

(Distance between

 

 

 

suspending bolts)

HBU-28CH03

840(Indoor unit)

*890(Ceiling opening)

HBU-28HH03

950(Ornament panel)

 

 

 

A

Note:

Dimension of ceiling opening marked with * can be aslarge as 910mm, but the matching part of ceiling with ornament panel shall be over 20mm.

20 Over

890(Ceiling opening)

690

(Distance between suspending bolts)

790 (Distance between suspending bolts) 890 Ceiling opening)

HBU-36HH03

HBU-42CH03

HBU-42CI03

HBU-42HI03

HBU-48CH03

Suspending bracket

160

Ceiling

A

690mm
840mm(Indoor unit)
890mm(Ceilingopening)
950mm(Ornamentpanel)

between

bolts

Distance

suspending

Distance between

 

 

 

suspending bolts 790mm

 

 

 

840mm(Indoor unit)

 

 

 

890mm(Ceiling opening)

 

 

 

950mm(Ornament panel)

HBU-48HJ03

HBU-48CK03

Ceiling

 

Suspending bracket

 

 

150mm

340

25mm
Ornament panel

60mm

 

 

 

 

17

Page 19
Image 19
Haier HBU-48CK03 3Preparation for the installation, Installation Procedure, 950Ornament panel, Refrigerant pipe, 690mm