Outdoor unit
5.Purging Method:To use vacuum pump | Liquid Side | Gas Side |
| 6.35mm(1/4") | 9.52mm(3/8") |
|
| 12.7mm(1/2") |
| ||
|
| |
Detach the service port's cap of |
|
|
valve rod's cap for |
| Gaugemanifold(for R410A) |
the service port into the projection of charge hose |
| Anti countercurrent joint |
(low) for gaugemanifold. Then connect the projection |
| |
|
| |
of charge hose (center) for gaugemanifold into |
|
|
vacuum pump. | Tube(for R410A) | Vacuum pump(for R410A) |
|
Open the handle at low in gaugemanifold, operate vacuum pump. If the
reach vacuum condition in a moment, check again.
Open |
Vacuumize for over 15min. And check the level gauge which should read
close the handle 'Lo' in gaugemanifold and stop the
operation of the vacuum pump. Close Check the condition of the scale and hold it for
flaring work again, the return to the beginning of .
Open the valve rod for the
After 6 seconds, close the
Open | Service port |
90ofor 6 sec. | |
90o |
|
In case of gas leakage, tighten
No gas leakage? parts of pipe connection. If leakage stops, then proceed
steps.
Detach the charge hose from the service port, open
To prevent the gas leakage, turn the service port's cap, the valve rod's cap for
After attaching the each caps, check the gas leakage around the caps.
CAUTION:
If it does not stop gas leakage, discharge whole refrigerants from the service port. After flaring work again and vacuumize, fill up prescribed refrigerant from the gas cylinder
Valve rod cap Service port cap Valve rod cap
Liquid Side 6.35mm(1/4")
Gas Side
9.52mm(3/8")
1.If the refrigerant of the air conditioner leaks, it is necessary to discharge all the refrigerant. Vacuumize first, then charge the liquid refrigerant into air conditioner according to the amount marked on the name plate.
2.Please do not let other cooling medium, except specified one (R410A), or air enter into the cooling circulation system. Otherwise, there will be abnormal high pressure in the system to make it crack and lead to personal injuries.
7