Haier 001051, HSU-0912RF03 Outdoor unit, Purging Method To use vacuum pump, Open

Models: 001051 HSU-0912RF03

1 12
Download 12 pages 31.91 Kb
Page 7
Image 7
5.Purging Method:To use vacuum pump

Outdoor unit

5.Purging Method:To use vacuum pump

Liquid Side

Gas Side

 

6.35mm(1/4")

9.52mm(3/8")

 

 

12.7mm(1/2")

 

2-way valve

3-way valve

 

 

Detach the service port's cap of 3-way valve, the

 

 

valve rod's cap for 2-way valve and 3-way's, connect

 

Gaugemanifold(for R410A)

the service port into the projection of charge hose

 

Anti countercurrent joint

(low) for gaugemanifold. Then connect the projection

 

 

 

of charge hose (center) for gaugemanifold into

 

 

vacuum pump.

Tube(for R410A)

Vacuum pump(for R410A)

 

Open the handle at low in gaugemanifold, operate vacuum pump. If the scale-moves of gause (low)

reach vacuum condition in a moment, check Open again.

Open

Vacuumize for over 15min. And check the level gauge which should read -0.1 MPa (-76 cm Hg) at low pressure side. After the completion of vacuumizing,

close the handle 'Lo' in gaugemanifold and stop the

operation of the vacuum pump.Manual backgroundManual background Close Manual backgroundManual background Check the condition of the scale and hold it for 1-2min.Manual backgroundManual backgroundManual background If the scale-moves back in spite of tightening, makeManual background

flaring work again, the return to the beginning of Manual background .

Open the valve rod for the 2-way valve to an angle of anticlockwise 90 degrees.

After 6 seconds, close the 2-way valve and make the inspection of gas leakage.

Manual background 2-way valve Manual backgroundManual backgroundManual backgroundManual backgroundManual background3-way valve

Open

Service port

90ofor 6 sec.

90o

 

In case of gas leakage, tighten

No gas leakage? parts of pipe connection. If leakage stops, then proceed Manual background

steps.

Detach the charge hose from the service port, open

2-way valve and 3-way. Turn the valve rod anticlockwise until hitting lightly.

To prevent the gas leakage, turn the service port's cap, the valve rod's cap for 2-way valve and 3-way's a little more than the point where the torque increases suddenly.

After attaching the each caps, check the gas leakage around the caps.

CAUTION:

If it does not stop gas leakage, discharge whole refrigerants from the service port. After flaring work again and vacuumize, fill up prescribed refrigerant from the gas cylinder

2-way valve Manual backgroundManual backgroundManual backgroundManual backgroundManual background3-way valve

2-way valve Manual backgroundManual backgroundManual backgroundManual backgroundManual background3-way valve

Manual backgroundManual backgroundManual background Valve rod cap Manual background Service port cap Manual background Valve rod cap

Liquid Side Manual background 6.35mm(1/4")

2-way valve

Gas Side

Manual background 9.52mm(3/8")

3-way valve

1.If the refrigerant of the air conditioner leaks, it is necessary to discharge all the refrigerant. Vacuumize first, then charge the liquid refrigerant into air conditioner according to the amount marked on the name plate.

2.Please do not let other cooling medium, except specified one (R410A), or air enter into the cooling circulation system. Otherwise, there will be abnormal high pressure in the system to make it crack and lead to personal injuries.

7

Page 7
Image 7
Haier 001051, HSU-0912RF03 installation manual Outdoor unit, Purging Method To use vacuum pump, Open