Installation instruction
The installation of air conditioner(only for reference)
1. Cut a wall hole or a window hole (see Fig.1). | Iron support | ||
|
|
| |
| A | B | A |
350 | 530 |
| |
| |||
|
|
|
2.Fix the iron support in a firm place with expansible screws.
3.Take the air conditioner and its attach- ments out from the packing carton.
4.Let the rear of the air conditioner raise slightly, the drain hole on the bottom can be seen.
Clog it with a black rubber stopper attached to the air conditioner (see Fig.2).
5.Insert the drain connecting pipe (with a seal circle) attached to the air conditioner into the vertical drain hole on the bottom (see Fig. 3).
6.The condensate needing to be led to the designated place, buy a soft plastic pipe with internal diameter of 16mm to connect the drain connecting pipe and tied it tightly.
7.All attachments being fixed, put the air conditioner on the iron support. If there is a drain hose, lead it to a required place (see Fig.5).
Thickness of the wall
Fig.1
Condenser
Rubber stopper
Fig.2
Fig.3
| Drain connecting |
Seal circle | pipe |
Drain hose |
|
Fig.4
11