Halsey Taylor Models OVL-II SER-Q- OVL-II ESR-Q, Make Sure Frame Configuration Matches

Models: OVL-II SER-Q OVL-II ER-Q OVL-II SR-Q OVL-II ESR-Q

1 12
Download 12 pages 4.73 Kb
Page 4
Image 4
Models

OVLERQ*C OVLSRQ*C OVLESRQ*F OVLSERQ*F

Models

OVL-II SER-QOVL-II ESR-Q

1. Cut a rectangular wall opening 37-1/2” (953 mm) W x

 

37-3/4” H (959 mm) and 4-1/2” (114 mm) above the

 

floor line (see Figure 7). The dimensions are required

 

to obtain proper rim and bubbler heights for

 

compliance with ANSI standard A117.1.

 

2. Reinforce the wall opening on all sides to adequately

 

support the water fountain. This reinforcement must

 

support up to 150 lbs. static load and provide a

 

means for securing the frame assembly in place.

 

NOTE: Building construction must allow for

 

adequate air flow on both sides and top of

 

remote chiller unit a minimum of 4” (102

 

mm) is required.

 

3. Install plumbing and electrical rough-ins. A junction

 

box for a (3) wire, 10 amp branch circuit is provided on

 

the inside of the chiller. (Standard 120 Volts, 60 Hz,

 

and single phase.)

Figure 6 – OVL-II SER-Q Rough-In

4. Remove frames and related hardware from

packaging. Release the two shelf rods by cutting

 

 

cable ties. Attach the two frames together through the

 

upright supports with (4) 5/16” x 3/4” (19 mm) long

 

bolts and nuts (not provided). Tighten securely.

MAKE SURE FRAME CONFIGURATION MATCHES

THE COOLER TO BE INSTALLED

REVERSED CONFIGURATION:

HIGHER UNIT ON THE RIGHT

STANDARD CONFIGURATION:

HIGHER UNIT ON THE LEFT

Figure 7 – Rough-In Assembly

Dual-Station Mounting Frames

97793C - 10/01

4

Page 4
Image 4
Halsey Taylor Models OVL-II SER-Q- OVL-II ESR-Q, Make Sure Frame Configuration Matches, Standard Configuration