OVLERQ*C OVLSRQ*C OVLESRQ*F OVLSERQ*F
Models
Figure 9 – OVL-II ER-Q/OVL-II SR-Q Rough-In
1. Cut a rectangular wall opening
(475 mm) W x
2. Reinforce the wall opening on all sides to adequately support the water fountain. This reinforcement must support up to 150 lbs. static load and provide a means for securing the frame assembly in place.
NOTE: Building construction must allow for adequate air flow on both sides and top of remote chiller unit. Minimum of 4” (102 mm) is required.
3. Install plumbing and electrical
4. Remove frame and related hardware from packaging. Release the two shelf rods by cutting cable ties.
Figure 10 –