Halsey Taylor OVL-II SR-Q, OVL-II ESR-Q, OVL-II ER-Q Ovlerq*C Ovlsrq*C Ovlesrq*F Ovlserq*F

Models: OVL-II SER-Q OVL-II ER-Q OVL-II SR-Q OVL-II ESR-Q

1 12
Download 12 pages 4.73 Kb
Page 5
Image 5
Legend

OVLERQ*C OVLSRQ*C OVLESRQ*F OVLSERQ*F

5.Install the frame assembly squarely in wall opening with frame upright support edges flush with the finished wall face. Secure the frame to the wall through holes with (12) 5/16” bolts or screws (not provided). Tighten securely.

NOTE: Be sure that frame is squared in location. Do not use less than required screw quantity and size.

6.Attach the chiller shelf support rods to the right side of the frame uprights at the second set of holes counting from the bottom and to the shelf at the (2) side holes. Line up the other shelf holes with the frame bottom holes and fasten the assembly to the wall opening using appropriately sized screws or bolts and nuts (not provided).

Legend

ItemDescription

A3/8” O.D. Tube - Water Outlet Connection

B 3/8” O.D. Tube - Water Inlet Connection

C 1-1/4” O.D. Tube - Waste Tube - Not provided

D Electrical Inlet on Chiller

Figure 8 – OVL-II SER-Q/OVL-II ESR-Q Rough-In Dimensions

97793C - 10/01

5

Page 5
Image 5
Halsey Taylor OVL-II SR-Q, OVL-II ESR-Q, OVL-II ER-Q, OVL-II SER-Q owner manual Ovlerq*C Ovlsrq*C Ovlesrq*F Ovlserq*F