OPERATING INSTRUCTIONS

NOTE: For additional information regarding the parts listed in the following pages, refer to the Assembly Diagram on page 14.

WARNING! Remove the Battery (28) from the tool and set the Rotation Button

(9)to its center, locked position before making any adjustments, changing accessories, or storing the tool.

2-Speed Switch (20)

Accessory Grip (14)

Torque Indicator Arrow

Chuck (16)

Rotation Button (9)

Torque Setting Ring (15)

Trigger (10)

Battery Pack (28)

Figure E

1.To install a drill/screwdriver bit: with the chuck pointing away from you, hold the Chuck Sleeve firmly in place and turn the Chuck (16) counterclockwise. Insert the shank of the bit all the way into the Chuck. While holding the Chuck Sleeve in place, turn the Chuck clockwise to lock the bit in place. The Chuck accepts up to 1/2” diameter bits. Insert the appropriate bit for your application and tighten the Chuck firmly. (See Figure E., above.)

2.Secure the workpiece in place, using a vise or clamps (not included).

Warning! Never change Torque Setting while drill is still rotating, as this can damage the drill.

3.The Torque Setting Ring (15) allows you to select 16 different driving torque settings, depending on the job required.

Torque Settings (1-16):

SKU 65949

For technical questions, please call 1-800-444-3353.

PAGE 10

Page 10
Image 10
Harbor Freight Tools 65949 operating instructions Operating Instructions, Figure E