Harbor Freight Tools 92388 operating instructions Unpacking, Assembly

Models: 92388

1 12
Download 12 pages 39.29 Kb
Page 7
Image 7

Unpacking

When unpacking, check to make sure the following parts are included.

(1)Insulated Smokehouse, 20 lbs. Capacity

(1)Stainless Steel Sawdust Pan

(4)Chrome Plated Grills with Brackets

(3)Hanging Racks (Hickory Dowels)

(1)Meat Thermometer

If any parts are missing or broken, please call Harbor Freight Appliances at the number on the cover of this manual.

All parts included with your Smokehouse

Assembly

1.Remove the Smokehouse and all parts from the box. Do not plug this product into a power outlet until it has been completely assembled and all safety precautions

are being observed.

2.Attach the Door Handle (6) to the Door using Bolts (15) and Nuts (10).Tighten securely.

3.Insert the Chimney (1) into the opening on the top of the Smokehouse. The fingers along the edge of the Chimney (1) may need to be bent in slightly to allow it to fit. Gloves should be worn during installation.

4.Check to be sure that the Base Board (8), Heating Plate (7) and Heating Element (5) are securely installed, and have not come loose during shipping.Tighten their retaining fasteners if necessary.

5.Place the Sawdust Pan (4) onto the Heating Element (5).

Installing the Chimney

REV 01/05

SKU 92388

For technical questions, please call 1-800-444-3353

Page 7

Page 7
Image 7
Harbor Freight Tools 92388 operating instructions Unpacking, Assembly