13 PP38+ Pellet Stove 3-90-08422R27_09/12
#8 installing through the ceiling
Through the ceiling vent, follow PL vent manufacturers
recommendations when using wall and ceiling pass
through. note: do not place joints within wall pass-
throughs.
Fig. 14
PL vent manufacturer's
restop spacer and
support
(See Page 7 for
corner installation
clearances)
Minimum flue vent conguration
It is required that outside air
be installed with this venting
congurationtoreducesmoke
and creosote smell in the room
in the event of power failure.
Min. above ground level

18"

Storm collar
Flashing
3" min. 3" min.
12" min.
3" min.
venting
Fig. 15
3" min.
No insulation or
other combustible
materials are
allowed within
3" of the pellet
vent pipe. Unless
specied by the
pipe manufacturer
12" min. wall to outlet
36" min clearance to any
combustible material
Fig. 16