ASSEMBLING THE MOWER
6
5
Delivery Checklist
1
2
7
8
43
Remove the machine from the packaging and check that the following items have been supplied correctly. If any items are missing contact, your local dealer. Main deck, lower and upper handlebars.
1. | Handlebar bolt x 2 | 5. | Throttle bolt x 2 | 9. Spanner x 1* | |
2. | Bush x 4 | 6. | Washer x 4 | 10. | Ties x 2* |
3. | Nut x 2 | 7. | Spring washer x 2 | 11. Ties* | |
4. Washer x 4 | 8. | Nut x 2 | 12. | U Bolt x 2* | |
|
|
|
| 13. | Handwheel x 2* |
|
| *Items 9 - 13 Not Illustrated |
|
Assembling
2
3
4
4
Step 1 Lower Handlebar
2Fit the lower handle first, and position the white bushes (2) as shown on
both sides. Place the lower handle between bushes with the kick stop assembley on the right hand side. Attach the lower handle using the fix- ings supplied.
1
Step 2 Upper Handlebar
Assemble the upper handle align holes and fit
13
12
5
5
4
Step 3 Throttle Assembly
Attach throttle assembly to the outside of the handlebar as shown and secure the cable using ties supplied.
4 7
8