CABLE ASSEMBLY
8.During steps 9 through 22, refer to the CABLE DIAGRAM on page 19 of this manual to verify proper cable routing. Before begin- ning this section, identify the Short Cable (23) and the Long Cable (58) by comparing the lengths and the ends of the cables.
IMPORTANT: While assembling the cables, do not overtighten the bolts and nuts securing the pulleys. The pulleys must turn freely.
9.Locate the Long Cable (58). Route the Long Cable around a 3 1/2” Pulley (15).
Using a 3/8” x 3 1/2” Bolt (16) and a 3/8” Nylon Jamnut (25), attach the 3 1/2” Pulley
(15)in the indicated location on the Top Frame
(55).Be sure that the end of the Cable with the ball is on the indicated side of the Pulley and that the Cable is between the Pulley and the hook on the Top Frame
10.Wrap the Long Cable (58) around a
(6).Attach the
11.Route the Long Cable (58) around a “V”- Pulley (6). Attach the
8
8 |
|
|
|
|
23 |
|
|
|
|
58 |
|
|
|
|
9 |
|
|
|
|
| 15 | 55 |
| 58 |
25 |
|
| ||
|
|
|
| |
Ball |
| 16 |
| |
Hook |
|
| ||
10 |
|
| 7 |
|
|
|
|
| |
|
|
| 6 | 50 |
|
|
|
| |
|
|
| 42 |
|
|
|
|
| 58 |
|
| 21 |
|
|
11 |
| 6 | 7 | 50 |
|
| |||
|
| 21 |
|
|
| 58 |
| 47 |
|
|
|
|
|