Heat & Glo • SL-550 / 750 / 950TR-E • 2118-900 Rev. L • 11/08 33
Top Vent - Vertical Termination
Venting with 4 elbows
Note: Use SLP Series
components only.
Note: There MUST be a 25%
reduction in total H when using
ex vent except when using the
simple up and out installation
(see Figure 7.3).
V1 MIN. H1 MAX. V2 MIN. H2 MAX. V3 MIN.
1-1/2 ft. 457 mm 4 ft. 1.2 m 4 ft. 1.2 m 4 ft. 1.2 m 3-1/2 ft. 1.0 m
V1 + V2 + V3 + H1 + H2 Maximum= 40 ft. (12.2 m)
Figure 7.11
V1
H1
V2
V3
H2