Heat & Glo • SL-550 / 750 / 950TR-E • 2118-900 Rev. L • 11/0828

INSTALLED

HORIZONTALLY

H1
H2
V1
Figure 7.5
Top Vent - Horizontal Termination
Venting with 2 elbows
V Minimum H1 + H2 Maximum
SL-550TR-E SL-750TR-E SL-950TR-E
90 Elbow 1/2 ft. 152 mm 1/2 ft. 152 mm 0 ft. 0 mm
1/2 ft.* 152 mm 1 ft. 305 mm 1 ft. 305 mm 1 ft. 305 mm
1-1/2 ft.* 457 mm 2 ft. 610 mm 2 ft. 610 mm 2 ft. 610 mm
2-1/2 ft.* 762 mm 4 ft. 1.2 m 4 ft. 1.2 m 4 ft. 1.2 m
3-1/2 ft. 1.1 m 6 ft. 1.8 m 6 ft. 1.8 m 6 ft. 1.8 m
4-1/2 ft. 1.4 m 14 ft. 4.3 m 14 ft. 4.3 m 14 ft. 4.3 m
H + H1 MAX. =14 ft. (4.3 m)
V + H + H1 MAX. = 40 ft. (12.2 m)
* See warning below
Note: Use SLP Series
components only.
Note: There MUST be a 25%
reduction in total H when using
ex vent except when using the
simple up and out installation
(see Figure 7.3).
Fire Risk.
• When using SLP-HRC-SS and SLP-HRC-ZC-SS
termination caps on top vented replaces, a one
foot minimum vertical vent section is required before
installing rst elbow.

WARNING *

When using DVP-TB1 termination cap on top vented replaces,
a three foot minimum vertical vent section is required before
installing rst elbow.