REFRACTORY - CB & CD SERIES INSTALLATION INSTRUCTIONS
1.Shut off the electricity to the appliance and turn the gas shutoff valve to the closed position. See Figure 1. Remove the screen and glass from the appliance.
OFF
Figure 1 - Gas Shutoff Valve
2.Lift the two top logs off the log set. See Figure 2.
3.Remove the grate/log assembly by removing the two screws as shown in Figure 2. Lift and pull the grate/log assembly from the front of the fi rebox.
Remove four screws securing the rear log. See Figure 3. Lift rear log and remove from fi rebox.
Figure 3 - Remove Rear Log
4.Carefully install a side refractory. Tip the bottom edge into posi- tion, and swing the top up. This will hold the back refractory in place. See Figure 4.
Screws
Figure 2 - Loosen Grate
Figure 4 - Tip Side Refractory
5.To secure the side refractory in place, remove the screw in the fi rebox side. Attach a refractory bracket (using the screw removed) to the fi rebox side. Leave screw loose until Step 7 to allow for adjusting. See Figure 5.
Figure 5 - Refractory Brackets
2 | 12/05 |