Henkel SubFloor manual Technical guide, Preparing The Subfloor, General Information

Models: SubFloor

1 8
Download 8 pages 25.86 Kb
Page 1
Image 1
Technical guide

Technical guide

Technical guide

 

 

168 to 175 Laying procedures

171 Tiles

172Sheet

173Saga

174Conductive, dissipative

and antistatic floorcoverings

174 Conductive flooring with conductive adhesive and conductive primer

175 Laying procedure for residential sheet products

176 Cold and hot welding

177 Adhesives

178 to 181 Maintenance

PREPARING THE SUBFLOOR

The flooring contractor has responsibility for laying the floorcovering only when he is satisfied that the subfloor is in a suitable condition to receive the flooring.

Local regulations regarding subfloors and the installation of floorcoverings must be complied with.

GENERAL INFORMATION

(NEW SUBFLOORS OR RENOVATION)

The subfloor must be absolutely hard, level, dry, smooth and structurally sound.

The subfloor must be free of cracks and other irregularities and must not be contaminated with paint, plaster, oil, grease or any other substance which could affect adhesion.

Cracks must be filled with an appropriate material.

The following information provides you with basic installation procedures. For technical products or more detailed instructions please refer to our technical guide.

168

169

Technical

 

guide

Page 1
Image 1
Henkel SubFloor manual Technical guide, Preparing The Subfloor, General Information, 168 to 175 Laying procedures