Technical guide | Technical guide |
|
|
168 to 175 Laying procedures
171 Tiles
172Sheet
173Saga
174Conductive, dissipative
and antistatic floorcoverings
174 Conductive flooring with conductive adhesive and conductive primer
175 Laying procedure for residential sheet products
176 Cold and hot welding
177 Adhesives
178 to 181 Maintenance
PREPARING THE SUBFLOOR
The flooring contractor has responsibility for laying the floorcovering only when he is satisfied that the subfloor is in a suitable condition to receive the flooring.
Local regulations regarding subfloors and the installation of floorcoverings must be complied with.
GENERAL INFORMATION
(NEW SUBFLOORS OR RENOVATION)
The subfloor must be absolutely hard, level, dry, smooth and structurally sound.
The subfloor must be free of cracks and other irregularities and must not be contaminated with paint, plaster, oil, grease or any other substance which could affect adhesion.
Cracks must be filled with an appropriate material.
The following information provides you with basic installation procedures. For technical products or more detailed instructions please refer to our technical guide.
168
169 | Technical |
|
guide