Hitachi GH 300 General Repair Information, Grounding, SAE O-Ring Installation

Models: GH 300

1 34
Download 34 pages 41.07 Kb
Page 6
Image 6

General Repair Information

General Repair Information

To reduce risk of serious injury, do not touch moving parts with fingers or tools while testing repair. Shut off sprayer when repairing. Install all covers, gaskets, screws and washers before operating sprayer

1.Keep all screws, nuts, washers, gaskets, and electrical fittings removed during repair procedures. These parts are not normally provided with replacement assemblies.

2.Test repair after problem is corrected.

3.If sprayer does not operate properly, review repair procedure to verify procedure was done correctly. If necessary, see Troubleshooting Guide, page 7, for other possible solutions.

4.Install belt guard before operation of sprayer and replace if damaged. Belt guard reduces risk of pinching and loss of fingers; see preceding WARNING.

Grounding

Ground sprayer with grounding clamp to earth ground for safe sprayer operation when using solvent-based materials. Fig. 1.

SAE O-Ring Installation

1. Unscrew lock nut to touch fitting.

2. Lubricate o-ring (A).

A

ti5414a

3. Screw in fitting hand tight.

ti5415a

4. Unscrew fitting until oriented properly.

ti5416a

5.Tighten lock nut to indicated torque. (Make sure washer is seated properly without pinching o-ring).

ti5417a

6250

FIG. 1

6

311797F

Page 6
Image 6
Hitachi GH 300 important safety instructions General Repair Information, Grounding, SAE O-Ring Installation