Hobart LT1 ML-104239 Electrical Connection, Chemical Supplies, Pump Priming, Electrical Data

Models: LT1 ML-104239

1 16
Download 16 pages 9.77 Kb
Page 7
Image 7
ELECTRICAL CONNECTION

ELECTRICAL CONNECTION

WARNING: ELECTRICAL AND GROUNDING CONNECTIONS MUST COMPLY WITH THE APPLICABLE PORTIONS OF THE NATIONAL ELECTRICAL CODE AND/OR OTHER LOCAL ELECTRICAL CODES.

WARNING: DISCONNECT ELECTRICAL POWER SUPPLY AND PLACE A TAG AT THE DISCONNECT SWITCH TO INDICATE THAT YOU ARE WORKING ON THE CIRCUIT.

ELECTRICAL DATA

 

 

Minimum Circuit Ampacity /

Model

Volts / Hertz / Phase

Maximum Protective Device

 

 

AMPS

 

 

 

 

120 / 60 / 1

20

LT1

 

 

220 / 50 / 1

15

 

 

 

 

380 / 50 / 3

15

 

 

 

Compiled in accordance with the National Electrical Code, ANSI / NFPA 70, 1996 edition.

Connect the incoming power supply through the hole for 12" trade size conduit (Fig. 7) in the back of the control box. Pigtail leads on the machine contactor and a ground lead are provided. Refer to the wiring diagram located on the inside of the control box lid.

CONDUIT HOLE

 

PRIMING SWITCHES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PL-40925-1

Fig. 7

CHEMICAL SUPPLIES

PL-40926-1

Fig. 8

Place the detergent, rinse aid, and sanitizer containers (which are obtained from an independent supplier) in a location where the delivery tubes will reach them. Put the red delivery tube in the detergent container, white in the sanitizer container, and blue in the rinse aid container. Make sure the delivery tube standpipes extend to the bottom of each container.

PUMP PRIMING

Prior to operation, the detergent, sanitizer, and rinse aid delivery pumps must be primed. Priming switches (Fig. 8) are provided on the control box. With electrical power connected, the doors closed, and the delivery tubes properly installed in each container, turn the power switch On, press the FILL switch to fill the wash tank with water, and press and hold each priming switch until the corresponding chemical reaches the end of the delivery tube.

Priming is necessary only at installation and after deliming or replacing the sanitizer, rinse aid, or detergent container(s).

– 7 –

Page 7
Image 7
Hobart LT1 ML-104239 manual Electrical Connection, Chemical Supplies, Pump Priming, Electrical Data