INSTALLATION
INSTALLATION WS-C206/WS-C208
Disconnect the
electrical power to the machine and follow lockout / tagout procedures.
1.Locate water supply line and appropriate drains for softener installation.
2.Install
NOTE: If installing a
5.Locate brass in/out adapters, 4
Fig. 1
3.Install high temperature prefilter if needed.
Fig. 3
6.Locate connector hoses and apply 2 to 3 wraps of Teflon tape to the male threads.
Fig. 4
7.Thread the brass in/out adapters tightly onto the threaded ends of the connector hoses.
Fig. 2
4.Remove all items from shipping package.