60
Handle Installation
TORQUE:
RIGHTHANDLE
BRACKET
LEFTHANDLE BRACKET
8 16mm FLANGE BOLT (4)
LEFTUPPER HANDLE ASSY
RIGHTUPPER HANDLE ASSY
Install the right and left handles on the generator upper frame using
the brackets and 4 flange bolts.
17 22 lbf·ft (24 29 N·m , 2.4 3.0 kgf·m)
07/11/07 10:29:36 31Z21600_061