30
OPERATION
AC PARALLEL OPERATION
PARALLELOPERATION CABLES
(optionalequipment)
Before connecting an appliance to either generator,make sure that the
appliance is in good working order and thatits electrical rating does
not exceed that of the receptacle.
Most motorized appliances require more than their electrical rating for
startup. When an electric motoris started, the overload indicator (red)
may come on. This is normalif the overload indicator (red) goes off
within 4 seconds. If the overload indicator (red)stays on, consult your
generator dealer.
During parallel operation,the Eco-Throttle switch should be in the
same position on both generators.
Start the engines (see page ) and make sure the outputindicator
(green) on each generatorcomes on (see page ).
Connect the parallel operation cables (optional equipment) between
the two EU1000i generators following the instructions supplied with
the parallel operation cables.
1.
2.
27
22
10/03/11 12:58:40 31ZT3620_031