INSTALLATION OF OPTIONAL PARTS
Remote Control Kit
The generator may be adapted for remote control operation by use of
an optional kit.
INSTALLATION
1. Remove the six 6 x 10 mm flange bolts that attach the control panel.
Remove the control panel.
6 x 10 mm FLANGE BOLTS
6 x 10 mtk FLANGE BOLTS
2. Position the relay box on the back of the control panel with the studs
inserted through the holes in the relay box flange. Install a 4 mm nut
and lock washer on each stud and tighten securely.
4 x 10 mm SELF-
TAPPING SCRE
CONTROL PANEL
COUPLER HOLDER
HOLE IN SUB PANEL
4 mm NUT
45