5. Reinstall the control panel with the 6 x 10 mm flange bolts.
6. Connect the remote control 6-P male coupler to the 6-P coupler on
the subpanle. Secure the remote control cable to the front hook with
a wire band positioned where shown.
WIRE BAND
FROiT HOOK
7. Connect the remote control 6-P male coupler to the switch box.
47