F118
5.Standing on a secure platform, lift the cabinet body and insert it into the frame in the drop ceiling.
6.Attach the free end of the wire to the structural ceiling. Align the cabinet edge with the upper side of the
7.Verify that the wire is strong enough to bear the load of the F118 before completing installation.
8.Level the air cleaner.
Electrical Hookup
All wiring must comply with applicable codes and ordinances. The air cleaners are internally
IMPORTANT
Check that the air cleaner is grounded for proper operation and safety.
Canadian Installations: Do not install in ceilings with thermal insulation value greater than
If installing an additional wall switch to regulate the air cleaner speed, only the Honeywell 32000234 (41105) Variable Speed Switch (optional) is recommended. Using a different speed controller can void the warranty.
1.Pull the wire to the electrical box through the hole in the top of the cabinet. Refer to Fig. 5 and 6 for typical wiring diagrams.
|
|
|
|
|
| 4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ON |
| 3 |
|
|
|
|
|
|
|
|
|
|
| BLACK | |||||||||||||
|
|
|
| HI |
|
|
|
|
|
|
|
|
|
|
|
| |||||||||||||||
|
|
|
| MED |
| 2 |
|
|
|
|
|
|
|
|
|
|
| BLUE |
| ||||||||||||
|
|
|
| LO |
| 1 |
|
|
|
|
|
|
|
|
|
|
| RED |
|
| |||||||||||
|
|
|
|
| |||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| GREEN |
|
|
| ||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||||||
|
|
|
|
|
|
|
|
|
|
|
| ||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLACK |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| WHITE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
| ORANGE |
|
|
|
|
|
| |||||||||||
|
|
|
|
|
|
|
| GROUND GREEN |
|
|
|
|
|
|
|
|
|
|
| ||||||||||||
INPUT: |
|
|
|
|
|
|
|
| YELLOW | ||||||||||||||||||||||
|
|
|
|
|
|
|
| ||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
| ||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
HIGH SPEED 2.8A AT 120V - 60 HZ |
|
|
|
|
|
|
|
|
|
|
| FAN MOTOR | |||||||||||||||||||
MED SPEED 2.0A AT 120V - 60 HZ |
|
|
|
|
|
|
|
|
|
|
| ||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||||||||
LOW SPEED 1.4A AT 120V - 60 HZ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| M16210A |
Fig. 5. Typical F118 120V, 60 Hz Wiring Diagram.
WARNING
Fire or Electric Shock Hazard.
Can cause personal injury or equipment damage. Be careful performing electrical check when air cleaner is turned on.
Be careful when working near air cleaner moving parts.
2.Turn on air cleaner power and check for proper opera- tion for two to three minutes. There should be a smooth, powerful blower sound with air discharging from both ends of the air cleaner.
3.Turn off the power.
Install Filters
CAUTION
Eye Exposure.
Harmful dust can obstruct or injure unshielded eyes.
CPZ module normally releases dust when handled. Always wear safety glasses when installing or remov- ing CPZ module.
CAUTION
Filter Media Damage Hazard.
Damage to the filter media can easily occur. Do not touch the pleated filter media.
Handle only the filter frame.
1.Install the particle filter and
a.Push aside the support rods.
b.With both hands, slide the filter up into the central portion of the cabinet and hold it in place.
c.Pull the support rods down and toward the center, until the filters are held in place and the weight com- pletely supported.
ON | 4 |
| |
3 | BLACK | ||
HI | |||
2 | BLUE | ||
MED | |||
1 | RED | ||
LO | |||
|
| ||
|
| GREEN | |
| BROWN |
| |
| BLUE | ORANGE | |
|
| ||
| GREEN/YELLOW | YELLOW | |
INPUT: |
| ||
|
| ||
HIGH SPEED 2.8A AT 230V - 50 HZ | FAN MOTOR | ||
MED SPEED 2.0A AT 230V - 50 HZ | |||
| |||
LOW SPEED 1.4A AT 230V - 50 HZ | M14417 |
IMPORTANT
Avoid excessive pressure on individual adsorbent panels.
1.Install the CPZ sorbent modules:
a.Remove CPZ™ sorbent modules from the packag- ing.
b.See Fig. 7 to install CPZ module at each end of the cabinet. Tilt and then push the module up about ten inches into the opening. Then allow it to rotate down so the bottom rests on the inside cabinet ledge.
Fig. 6. Typical F118 230V, 50 Hz Wiring Diagram.
6 |