Hoover HEH 604 manual Operations to be carried out to make a new connection

Models: HEH 604

1 11
Download 11 pages 3.69 Kb
Page 6
Image 6
2 - Operations to be carried out to make a new connection:

2 - Operations to be carried out to make a new connection:

. Choose the supply cord in accordance with the recommendations in the table on next page.

. The hob must be in situation as shown :

Earth

Terminal

. Pass the supply cord into the clamp.

. Strip the end of each conductor of the supply cord on a 10 mm length, by taking in account the requested length of the cord for the connection on the terminal block.

. According to the installation and with the help of shunt bars which you should have recovered in the first operation, fix the conductor as shown on the chart.

. Engage the earth wire yellow/green on the earth terminal, screw the nut and verify the continuity of the earth.

. Screw the cable clamp.

. Fix the cover.

6

Page 6
Image 6
Hoover HEH 604 manual Operations to be carried out to make a new connection